PRODUCTION
According to the requirement of time nodes in the key links of design, production, supply and installation, the detailed construction schedule of each stage is worked out, and the necessary lamps and lanterns for production are manufactured according to the preparation and deepening of drawings, pre-production sample production and confirmation, material sample confirmation and production.